Friday February 27th
This week all of the curb pieces have been cut and pasted. Also all of the corner pieces that needed to be soaked and bent have been and are just waiting to be painted. Continuation of work must be done on the grass and the parking lot.
Friday, February 27, 2009
Tuesday, February 24, 2009
LOG 7, MP3
Tuesday February 24th
Today I began cutting 1/16th x 1/16th " balsa wood strips for the curb. These strips break very easily and must be handled with care. The strips are the exact scale, modeling 6" curbs
Today I began cutting 1/16th x 1/16th " balsa wood strips for the curb. These strips break very easily and must be handled with care. The strips are the exact scale, modeling 6" curbs
Friday, February 20, 2009
LOG 6, MP3
Friday February 20th
Today I finished cutting out the areas of grass. Paint for the parking lot needs to be bought, along with sand to give the parking lot texture. I also need to buy material that looks like brick for the walk ways.
Today I finished cutting out the areas of grass. Paint for the parking lot needs to be bought, along with sand to give the parking lot texture. I also need to buy material that looks like brick for the walk ways.
Monday, February 16, 2009
LOG 5, MP 3
Tuesday, February 16th
This week so far everything on the site has been laid out accordingly. I began cutting out the areas of grass needed for the landscape and laying them out on the model. I realized that I need to buy more grass to finish the model.
This week so far everything on the site has been laid out accordingly. I began cutting out the areas of grass needed for the landscape and laying them out on the model. I realized that I need to buy more grass to finish the model.
Friday, February 13, 2009
LOG 4, MP3
Friday, February 13th
This week the walls began to be constructed by my other group members. I began to layout the parking lot and other pieces of the site. The whole site was printed out to ensure that placement of the pieces of the parking lot and landscape all went on the right spots.
This week the walls began to be constructed by my other group members. I began to layout the parking lot and other pieces of the site. The whole site was printed out to ensure that placement of the pieces of the parking lot and landscape all went on the right spots.
Tuesday, February 10, 2009
LOG 3, MP3
Tuesday, February 10th
This week so far the foam core board for the base of our model was cut out. The board was cut out to be 24" by 24", following the TSA Regulations. The printed out site plan was also cut to this size.
This week so far the foam core board for the base of our model was cut out. The board was cut out to be 24" by 24", following the TSA Regulations. The printed out site plan was also cut to this size.
Friday, February 6, 2009
Log 2, MP3
Friday, February 6th
Today the floor plan was printed out at the appropriate scale. There was some trouble deciding on what the scale should be, and printing out the floor plan on the plotter proved to be harder than anticipated. The final plot was printed out and left over night until today.
Today the floor plan was printed out at the appropriate scale. There was some trouble deciding on what the scale should be, and printing out the floor plan on the plotter proved to be harder than anticipated. The final plot was printed out and left over night until today.
Subscribe to:
Posts (Atom)