Last night was the 20009 Senior Project Night. All of the projects were set up around builing 77 and parents along with mentors could view our exhibits we had prepared the afternoon of. My exhibit consisted of my exhibit board, along with the floor plan, site plan, and actual model. Many guests were curious about my project, and explaining it to them came easier than I had expected. I greatly enjoyed sharing my work with those who were interested, and appreciated the positive feed back. Many of those who viewd my project were impressed with the work done, mainly the floor plan. I believe that the exhibit night was a sucess.
Showing posts with label LOG. Show all posts
Showing posts with label LOG. Show all posts
Friday, May 22, 2009
Thursday, May 7, 2009
MP4 LOG
Thursday May 7th
Today I will be visiting the Emergency Medical Office in Middletown, and the Emergency Medical Cetner of Shrewsbury, to meet with nurses that are familar with the facility and will be able to assist me in the testing portion of my project. The nurses have agreed to fill out a survey and speak with me on the layout of my floor plan and the design of the parking lot as it pertains to emergency situations.
Today I will be visiting the Emergency Medical Office in Middletown, and the Emergency Medical Cetner of Shrewsbury, to meet with nurses that are familar with the facility and will be able to assist me in the testing portion of my project. The nurses have agreed to fill out a survey and speak with me on the layout of my floor plan and the design of the parking lot as it pertains to emergency situations.
Thursday, April 2, 2009
LOG 16 MP3
Friday March 27th
Today in class i began the painting of the parking lot by mixing black paint with sand and small rocks. Due to the paper curling we had to lay out another board ontop of it so it would dry flat.
Today in class i began the painting of the parking lot by mixing black paint with sand and small rocks. Due to the paper curling we had to lay out another board ontop of it so it would dry flat.
Sunday, March 22, 2009
LOG 15 MP3
Tuesday March 23rd
This week final touches are being done on the model, parking lot lines were touched up, exterior walls were glued into place, and "air conditioning units" were glued to the roof. The board needs to be bent back the other direction.
This week final touches are being done on the model, parking lot lines were touched up, exterior walls were glued into place, and "air conditioning units" were glued to the roof. The board needs to be bent back the other direction.
Friday, March 20, 2009
LOG 14 MP3
Friday March 20th
Curbs are all finished for the parking lot, and I have begun to cut out the grass and lay it out on the site plan.
Curbs are all finished for the parking lot, and I have begun to cut out the grass and lay it out on the site plan.
Tuesday, March 17, 2009
LOG 13 MP3
Tuesday March 17th
Today I was able to cut out the site plan and glue it down to the site board which was cut earlier this week. I continued working on the curbs today and will continue to do so throughout the week.
Today I was able to cut out the site plan and glue it down to the site board which was cut earlier this week. I continued working on the curbs today and will continue to do so throughout the week.
Friday, March 13, 2009
LOG 12 MP3
Friday March 13
Today in class I began cutting the pieces of curbing that are to be used on my model. These pieces will be painted gray and bent to follow the curb if necessary.
Today in class I began cutting the pieces of curbing that are to be used on my model. These pieces will be painted gray and bent to follow the curb if necessary.
Tuesday, March 10, 2009
LOG 11 MP3
Tuesday March 10
So far this week I was able to use the plotter to layout the site plan on a 24" by 24" piece of paper which allow me to easily layout the site and the parking alot, and allow the other members of my group to construct their parts.
So far this week I was able to use the plotter to layout the site plan on a 24" by 24" piece of paper which allow me to easily layout the site and the parking alot, and allow the other members of my group to construct their parts.
Thursday, March 5, 2009
LOG 10 MP3
Friday March 6th
This week I have finished my press release and also have bought all of the necessary grass and sand needed for modeling. Due to Mr. Alfonse's absences on Thursday and my absence on Wednesday due to severe illness I have not yet been able to re print the site plan necessary for continuation of construction.
This week I have finished my press release and also have bought all of the necessary grass and sand needed for modeling. Due to Mr. Alfonse's absences on Thursday and my absence on Wednesday due to severe illness I have not yet been able to re print the site plan necessary for continuation of construction.
LOG 9 MP3
Tuesday March 3rd
This past Sunday I began to write my Press Release which is due this Thursday. We have also made progress on the construction and need to print out another site plan that will be glued down to the board to use as a base of construction. I also need to go buy more grass and sand.
This past Sunday I began to write my Press Release which is due this Thursday. We have also made progress on the construction and need to print out another site plan that will be glued down to the board to use as a base of construction. I also need to go buy more grass and sand.
Friday, February 27, 2009
Log 8 MP3
Friday February 27th
This week all of the curb pieces have been cut and pasted. Also all of the corner pieces that needed to be soaked and bent have been and are just waiting to be painted. Continuation of work must be done on the grass and the parking lot.
This week all of the curb pieces have been cut and pasted. Also all of the corner pieces that needed to be soaked and bent have been and are just waiting to be painted. Continuation of work must be done on the grass and the parking lot.
Friday, February 20, 2009
LOG 6, MP3
Friday February 20th
Today I finished cutting out the areas of grass. Paint for the parking lot needs to be bought, along with sand to give the parking lot texture. I also need to buy material that looks like brick for the walk ways.
Today I finished cutting out the areas of grass. Paint for the parking lot needs to be bought, along with sand to give the parking lot texture. I also need to buy material that looks like brick for the walk ways.
Monday, February 16, 2009
LOG 5, MP 3
Tuesday, February 16th
This week so far everything on the site has been laid out accordingly. I began cutting out the areas of grass needed for the landscape and laying them out on the model. I realized that I need to buy more grass to finish the model.
This week so far everything on the site has been laid out accordingly. I began cutting out the areas of grass needed for the landscape and laying them out on the model. I realized that I need to buy more grass to finish the model.
Friday, February 13, 2009
LOG 4, MP3
Friday, February 13th
This week the walls began to be constructed by my other group members. I began to layout the parking lot and other pieces of the site. The whole site was printed out to ensure that placement of the pieces of the parking lot and landscape all went on the right spots.
This week the walls began to be constructed by my other group members. I began to layout the parking lot and other pieces of the site. The whole site was printed out to ensure that placement of the pieces of the parking lot and landscape all went on the right spots.
Tuesday, February 10, 2009
LOG 3, MP3
Tuesday, February 10th
This week so far the foam core board for the base of our model was cut out. The board was cut out to be 24" by 24", following the TSA Regulations. The printed out site plan was also cut to this size.
This week so far the foam core board for the base of our model was cut out. The board was cut out to be 24" by 24", following the TSA Regulations. The printed out site plan was also cut to this size.
Friday, February 6, 2009
Log 2, MP3
Friday, February 6th
Today the floor plan was printed out at the appropriate scale. There was some trouble deciding on what the scale should be, and printing out the floor plan on the plotter proved to be harder than anticipated. The final plot was printed out and left over night until today.
Today the floor plan was printed out at the appropriate scale. There was some trouble deciding on what the scale should be, and printing out the floor plan on the plotter proved to be harder than anticipated. The final plot was printed out and left over night until today.
Tuesday, February 3, 2009
LOG 1- MP3
Tuesday, February 3rd
The beginning of this week was dedicated to creating a plan of procedures as far as construction is concerned and what needed to get done. A shopping list was also created and a date was picked to pick up supplies.
The beginning of this week was dedicated to creating a plan of procedures as far as construction is concerned and what needed to get done. A shopping list was also created and a date was picked to pick up supplies.
Tuesday, November 25, 2008
Log 5 MP2
Tuesday November 25th, 2008
Today in class I continued working on my dimensioned drawing of the floor plan. I was able too add in the necessary dimensions for construction.
Today in class I continued working on my dimensioned drawing of the floor plan. I was able too add in the necessary dimensions for construction.
Friday, November 21, 2008
Log 4 MP2
Friday November 21st
Today I was able to continue work on my floor plan and continue dimensioning. I have begun to dimension the interior of the building and the exterior. I had to go back and fix the exterior wall dimensions in order for them to be even measurements. After I finished this I was able to continue dimensioning. I need to be done with this drawing by the end of next week in order to stay on schedule.
Today I was able to continue work on my floor plan and continue dimensioning. I have begun to dimension the interior of the building and the exterior. I had to go back and fix the exterior wall dimensions in order for them to be even measurements. After I finished this I was able to continue dimensioning. I need to be done with this drawing by the end of next week in order to stay on schedule.
Tuesday, November 18, 2008
Log 3- MP2
Tuesday, November 18th
Today in class I was able to continue work on my floor plan. I was able to determine that the exterior walls of the building must be even measurements or be on the odd 4' or the even 8'. This will need to be corrected on my drawing and adjustments will need to be made.
Today in class I was able to continue work on my floor plan. I was able to determine that the exterior walls of the building must be even measurements or be on the odd 4' or the even 8'. This will need to be corrected on my drawing and adjustments will need to be made.