Tuesday, November 25, 2008

Log 5 MP2

Tuesday November 25th, 2008
Today in class I continued working on my dimensioned drawing of the floor plan. I was able too add in the necessary dimensions for construction.

Friday, November 21, 2008

Log 4 MP2

Friday November 21st
Today I was able to continue work on my floor plan and continue dimensioning. I have begun to dimension the interior of the building and the exterior. I had to go back and fix the exterior wall dimensions in order for them to be even measurements. After I finished this I was able to continue dimensioning. I need to be done with this drawing by the end of next week in order to stay on schedule.

Tuesday, November 18, 2008

Log 3- MP2

Tuesday, November 18th
Today in class I was able to continue work on my floor plan. I was able to determine that the exterior walls of the building must be even measurements or be on the odd 4' or the even 8'. This will need to be corrected on my drawing and adjustments will need to be made.